Location: VSIP Binh Duong Industrial Park
Supervision and Installation Items:
- Installation of boilers and oil tanks
- Installation of steam pipelines connecting the boiler to the factory’s heat exchange equipment
- Operation, adjustment, and handover of the system to the factory.

