Glomed Pharmaceutical Factory Project

Location: VSIP Binh Duong Industrial Park

Supervision and Installation Items:

  • Installation of boilers and oil tanks
  • Installation of steam pipelines connecting the boiler to the factory’s heat exchange equipment
  • Operation, adjustment, and handover of the system to the factory.